Page 1 of 1

How to achieve multiple growth in traffic and sales from your website?

Posted: Wed Jan 22, 2025 5:02 am
by maksudasm
I have always been concerned about the issue of moving to a fundamentally new level. So that the indicators would grow not by 2 or 3 times, but by several orders of magnitude. From a thousand visits to ten thousand or from ten thousand to a hundred thousand, if we are talking about a website, for example.

And I know that such leaps are always the result of painstaking work in five areas:

Technical condition of the site.
SEO.
Collection of site semantics.
Creating useful content.
Working on conversion.
And at the same time, every manager needs an increase in sales and the number of applications from the site at the moment.

To get this growth, download our step-by-step template for increasing sales from the site:
Download template
Already downloaded
153345


Rights and obligations of both parties to the contract
The contractor's responsibilities include:

compliance with the deadlines overseas chinese in europe data for completing the work specified in the contract and their estimated cost;

carry out activities using their own forces, means and materials, provided that the agreement does not stipulate otherwise, while the proper quality of the means and equipment must be guaranteed;

perform work with the required characteristics, even if compliance with standards and the warranty period are not specified in the contract;

inform the customer about all situations that may affect the final result of the activity (changes in deadlines, estimated cost, quality of raw materials and materials), suspend execution until the client clarifies the situation.

Court

In case of improper performance of its obligations, the contractor may face the following:

Source: shutterstock.com

termination of the contract by the customer and demand for compensation payments;

if the quality of the work performed is lower than agreed, the client has the right to claim a replacement of the subject of the transaction, elimination of defects, or a reduction in the price;

in the event of failure to promptly inform the consumer of changed circumstances and continuation of the agreement without his consent, reference to these transformations will not be taken into account.

The Customer is obliged to:

if the documents stipulate a change in the properties and quality of something, then the subject of the contract must be provided to the contractor in proper condition within a specified period;

if the provision as agreed is within the customer's area of ​​responsibility, then all necessary materials and resources must be provided within the agreed time;

respond promptly to information from the contractor;

receive the results of the activity on time in accordance with the acceptance procedure;

make payments for completed work.