Step three. Paving stones
Cord. First of all, a cord is fixed on the path (or platform).
Laying. After this, laying begins according to the chosen pattern - from the curb and away from you, so that the tiles lie close to each other.
Leveling. If the tile is not level, you need to remove it, remove bosnia and herzegovina mobile database excess sand with a trowel and put it back.
Final alignment. When the area is completely laid, you should use a level to measure how evenly it is laid and use a mallet to bring all the tiles into alignment. The area should be level.
Seams. After this, the seams between the tiles are filled with sand or a cement-sand mixture.
When everything is finished, the paving stones are swept clear of any remaining debris.
It requires minimal maintenance - just sweep it when debris falls on it and periodically add sand to the seams, which will be washed out by rainwater over time.
Garden borders made of bricks and paving stones
Very often after construction there are a lot of bricks or paving stones (paving slabs) left over and here is a good opportunity to make garden borders for decorating a flower bed or path.
This border will allow you to beautifully separate your flowerbed from the lawn or path, preventing plants from spreading. In addition, it is easier and cheaper to do this than with stone products.
How to Install a Sawtooth Garden Edging with Bricks or Square Pavers
Step 1: Place stakes in the corners of the bed and stretch a string around the entire perimeter. This is to ensure that your trench is level.
Step 2: Dig a trench along the rope about 20cm wide and 10cm deep and then raise the level of the stretched rope to the height of half a brick.
Once all the preparations are done, it's time for the main task:
-
- Posts: 1040
- Joined: Sat Dec 21, 2024 3:36 am