Let's continue the laying process:

Collection of structured data for analysis and processing.
Post Reply
zihadhosenjm40
Posts: 1040
Joined: Sat Dec 21, 2024 3:36 am

Let's continue the laying process:

Post by zihadhosenjm40 »

How to apply tile adhesive
Apply the adhesive solution to the surface using a spatula or scoop.
Use a notched trowel to scrape off any excess (return it to the bucket). This will also create grooves of equal depth, which will ensure an even layer for all elements. Keep the notched trowel at the same angle to the surface each time to ensure the adhesive layer remains the same thickness.
If you are applying mortar to tiles, use a spatula to scrape off excess from all four sides.

Step 6: Laying the tiles

Carefully connect the first tile to the floor in the place marked during marking.
Press the element onto the surface using light taps by hand or a rubber mallet.


Check the horizon with a building level in 8 directions: diagonally (2 dimensions), in the center along the sides (2 dimensions), on each side of the tile (4 dimensions). Use a rubber mallet to achieve an absolutely flat surface.


Prepare the second element and place it next to it, according to the diagram.
The seams between the tiles should be singapore mobile database same width. To do this, insert plastic crosses between them.

Watch how to lay tiles in this video (~ 8 minutes of video)

After laying each new tile, use a long building level to check the horizontality of the surface being laid.
Step 7: Trimming the tiles
The outer rows need to be cut to size, for this you can use:

Small tile cutter,
Grinding machine "Bulgarka"
Glass cutter, sharp knife, drill, etc.
Cutting with a tile cutter
Insert the element into the tool and align the cut line with the marks.
Post Reply